Search
Shop by truck
Filter products

Shop By Truck

Manufacturers

XD475 XDP Remanufactured AE Fuel Injector - Ford 7.3L Powerstroke 1999.5-2003 (#8 Long Lead)

SKU: XD475
Mftr. Part#: XD475
Replace the #8 long lead failed fuel injector in your 1999.5-2003 7.3L Powerstroke Diesel with XDP's remanufactured Fuel Injectors. Each injector is made to meet or exceed the manufacture specifications to ensure a quality product. A $125 core charge will be applied to each injector.

PRODUCT DETAILS (click to expand)

PRODUCT SPECS (click to expand)

PRODUCT OPTIONS

*

Since this is a remanufactured product, a temporary "core charge" is added up front until we receive your original unit back. Once received and inspected, the charge will be reversed back to you. The core charge will be added to the price below. (Required) Please refer our Core Retun Policy before sending the core back. 

$240.74

Overview

Each XDP Reman Fuel Injector is precision made to ensure it exceeds the engine manufacturers' most current design specifications. Once remanufactured, each injector is tested for injection timing measurements, poppet seat leakage test and shot to shot flow meters for best-in-class testing.

Features

  • $125 Core charge
  • Stock HP & flow rating
  • Advanced end-of-line testing
  • In-line error proofing incorporated in assembly process
  • Performance testing of nozzles for flow, leakage & needle lift

Warranty

2 Year Unlimited Mileage