Chercher
Shop by truck
Filter products

Filtrer par Camion

Les fabricants

WDFFDADAESET Full Force Reman 140cc AD/AE Stock Replacement Fuel Injector Set (Long Lead #8)- Ford 7.3L Powerstroke 1999.5-2003

SKU: FFDWDFFDADAESET
Référence fabricant: WDFFDADAESET
A direct-fit replacement, the Full Force Reman 140cc AD/AE Stock Replacement Fuel Injector Set delivers the factory 140cc of fuel to your 1999.5-2003 Ford 7.3L Powerstroke.

Détails du Produit (cliquez pour afficher)

Spécifications produits

PRODUCT OPTIONS

*

Since this is a remanufactured product, a temporary "core charge" is added up front until we receive your original unit back. Once received and inspected, the charge will be reversed back to you. The core charge will be added to the price below. (Required) Please refer our Core Retun Policy before sending the core back. 

$1,820.00

Overview

A direct-fit replacement, the Full Force Reman 140cc AD/AE Stock Replacement Fuel Injector Set delivers the factory 140cc of fuel to your 1999.5-2003 Ford 7.3L Powerstroke. Each injector is remanufactured from quality components, and provides you with long-term reliable performance.

Features

  • Direct-Fit AD/AE Fuel Injector Set
  • Stock Fuel Flow Rating
  • Remanufactured With Quality Components

Warranty

18 Month / Unlimited Mileage