Chercher
Shop by truck
Filter products

Filtrer par Camion

Les fabricants

AP63804AE Alliant 7.3L HEUI Fuel Injector CODE "E" Long Lead - Ford 7.3L Powerstroke 1999-2003

SKU: AP63804AE
Référence fabricant: AP63804AE
Fabricant: Alliant Power
Alliant Power's Replacement OEM fuel injector for your 1999 - 2003 Ford 7.3L Powerstroke - "E" Injector - Long Lead Cylinder 8 - A $187.50 core charge will apply for each injector.

Détails du Produit (cliquez pour afficher)

Spécifications produits

PRODUCT OPTIONS

*

Since this is a remanufactured product, a temporary "core charge" is added up front until we receive your original unit back. Once received and inspected, the charge will be reversed back to you. The core charge will be added to the price below. (Required) Please refer our Core Retun Policy before sending the core back. 

$550.00

Overview

  • Remanufactured by UpTime Parts/PurePower Technologies - an OE rebuilding company
  • Each injector is 100% flow tested and nitrogen tested for leaks
  • Flow volume, leakage rate, max needle lift and valve opening pressure (VOP) are also tested
  • All sealing surfaces are refinished and maintain less than 2 microns of flatness
  • Precision honed intensifier body is matched with new plungers to operate at extreme pressures and temperatures
  • Quality OEM injector at an aftermarket price
  • Long Lead (LL or blue harness connector) Injector.

OEM Part Numbers:

  • 1833639C1
  • 1833640C1
  • 1833644C1
  • 1833645C1
  • 1833646C92
  • 1833647C91
  • F81Z9E527EARM
  • XC3Z9E527AARM
  • F61Z9VE527ERM
  • 5C3Z9VE527ARM

Warranty

Parts
  • 24-Months
  • Refer to Manufacturer's Warranty
Labour
  • 24-Months
  • Refer to Manufacturer's Warranty